Lane and Ramp Lane Closures Scheduled

The Sherman Minton Renewal team will be repairing guardrail on I-64 during the evening of November 3, weather permitting.  Lane and Ramp Lane closures will be implemented as follows:

  • Right lane closure I-64 Westbound beginning on or after 10 p.m. to 6 a.m. west of the Sherman Minton Bridge.
  • Left ramp lane from I-64 Westbound to New Albany beginning on or after 10 p.m. to 6 a.m.  Access will still be provided to New Albany via the right exit lane.

The times noted above are permissible times for the closures.  These closures may or may not be in effect for the entire period noted. Motorists should slow down, drive distraction free and be aware of the changing traffic patterns.

Delays are expected and motorists are encouraged to use alternate routes where possible.

About The Sherman Minton Renewal Project

The Sherman Minton Renewal is a major bridge rehabilitation and painting project that will significantly extend the life of the 61-year-old bridge. The double-decked bridge carries six lanes of traffic (I-64 and US 150) over the Ohio River connecting Louisville, KY and New Albany, IN.

Learn More

More News