Lane Restrictions Needed for Guardrail Repair

The Sherman Minton Renewal team will be repairing guardrails within the project area during the evening of Thursday, June 22, weather permitting.  Lane closures will be implemented as follows:

  • I-64 Eastbound to I-265 Eastbound: ramp right lane closure and I-64 EB left lane closure (near the ramp) beginning on or after 9 p.m. to 5 a.m.
  • I-64 Eastbound at New Albany exit: right lane closure beginning on or after 9 p.m. to 5 a.m.  Access to exit ramp will be maintained.
  • I-64 Westbound near mile post 122.8 (just west of New Albany): right lane closure beginning on or after 10 p.m. to 6 a.m.
  • I-64 Westbound near mile post 122.5 (west of New Albany): left lane closure beginning on or after 10 p.m. to 6 a.m.

These closures may or may not be in effect for the entire period noted. Motorists should slow down, drive distraction free and be aware of the changing traffic patterns.

Delays are expected and motorists are encouraged to use alternate routes where possible.

About The Sherman Minton Renewal Project

The Sherman Minton Renewal is a major bridge rehabilitation and painting project that will significantly extend the life of the 61-year-old bridge. The double-decked bridge carries six lanes of traffic (I-64 and US 150) over the Ohio River connecting Louisville, KY and New Albany, IN.

Learn More

More News