Lane Closure Scheduled for Guardrail Repair

A left lane closure is required on eastbound I-64 at the I-265 interchange to perform guardrail repair work between the shoulder of I-64 eastbound lanes and the I-265 eastbound ramp lanes.

The right lane of the I-265 eastbound ramp will also be closed.  These lane closures are anticipated to be in effect from 10:00 p.m. February 10 through 4:00 a.m. February 11.

Delays are expected and motorists are encouraged to use alternate routes where possible.

About The Sherman Minton Renewal Project

The Sherman Minton Renewal is a major bridge rehabilitation and painting project that will significantly extend the life of the 61-year-old bridge. The double-decked bridge carries six lanes of traffic (I-64 and US 150) over the Ohio River connecting Louisville, KY and New Albany, IN.

Learn More

More News